DIY Hydroelectric: Pipe & Valve Pit Complete, Flow Testing. Part 6.
28 November, 2025
I need to finish running the pipe down the hill, which is the above ground portion of the install. I continue down the hill with a 1/4" per foot of drop until it can turn sharply downward at the wye fitting, where the..
Read More